ATTACHMENT I: Modifications to Newly Constructed Facilities

Please Note: Paragraph 58 of the Settlement Agreement requires that within three (3) months of the effective date of this Agreement, the City provide signage as necessary to comply with 28 C.F.R. ยค 35.163(b), after having surveyed all facilities that are the subject of this Agreement for the purpose of identifying those that have multiple entrances not all of which are accessible. The chart below lists the facilities surveyed by the Department, the access issues identified during the survey, and the actions required to correct the access issues. Required actions are listed using an alphanumeric code. The key to the alphanumeric codes is provided in Attachment M to this Agreement. In order to ensure that the following spaces and elements in City facilities for which construction was commenced after January 26, 1992, are readily accessible to and usable by persons with disabilities, the City will take the actions referenced by the alphanumeric code and described in detail in Attachment M to this Settlement Agreement within the time periods specified below, which time periods will begin to run on the effective date of this Agreement.

Item # Access Issue Required Action Completion Date
1. Riverfront Dog Park, Vaughn Drive, Madison, IN 47250    
1.1. Route: The route from the parking to the Dog Park is inaccessible because it is not stable, firm, and slip resistant. AR1 6 months
1.2. Entrance: The entrance and exit to the dog exercise areas are inaccessible because the gate access key pads are mounted with the controls 59 inches high. TR4 6 months
1.3. Within Gated Area: The routes to the benches and the dog washing station inside the park are inaccessible because they are not stable, firm and slip resistant. AR1 6 months
2. Madison B3 Skate Park, Green Road and Allen Street, Madison, IN 47250    
2.1. Routes:    
2.1.a. The routes from the road to both gate entrances located near to the road are inaccessible because they are not stable, firm, and slip resistant. AR1 6 months
2.1.b. The route from the road to the north gate entrance is inaccessible because the slope is 9.7%. AR1 6 months
2.1.c. The route from the road to the south gate entrance is inaccessible because there is a 4.5 inch change in level at the entrance gate. AR1 6 months

 